CMA CGM 2026 年 3 月的客户通知明确了卸货港为摩加迪沙(SOMGQ)的货物如何申报 ECTN,并要求将编号写入最终提单的货物描述。CMA CGM’s March 2026 advisory sets out ECTN instructions for shipments discharging at Mogadishu (SOMGQ), including the reference in the cargo description on the final bill of lading.
按 CMA CGM 通知,适用对象为 2026 年 3 月 1 日及以后到港、卸货港为摩加迪沙的船舶所载相关货物。该通知要求起运港装货前取得编号,申请时准备提单草稿、商业发票及运费发票。The CMA CGM notice applies to relevant cargo on vessels arriving at Mogadishu from 1 March 2026. It calls for obtaining the reference before loading and preparing the draft bill of lading, commercial invoice and freight invoice.
索马里 ECTN 平台和不同承运人的通知对适用范围或执行节点的表述有差异。订舱时请按实际卸货港、船期及提单日期向承运人确认,以便在截单前补齐资料。The Somalia ECTN platform and carrier notices describe the scope or implementation dates differently. Confirm the requirements with your carrier for the actual discharge port, sailing and bill-of-lading date before the documentation cutoff.
出口准备与操作建议Export preparation and practical guidance
订舱时先确认实际卸货港Confirm the actual discharge port when booking
不要把“索马里货物”视为完全相同的办理场景。核对订舱信息中的卸货港、最终目的地及实际承运人,并向承运人确认本票执行口径。涉及转运、换船或港口调整时,应把变化及时反馈给单证办理人员。Not every Somalia-bound shipment follows the same documentation scenario. Check the discharge port, final destination and actual carrier at booking and confirm the instructions for that consignment. Inform the documentation team promptly of transshipment, vessel or port changes.
编号、提单和贸易单据的对应关系Link the reference to the shipping records
可将提单草稿、商业发票和运费资料按票归档,核对收发货人、港口、货物描述、重量及费用口径。取得编号后,还需按实际承运人要求检查最终提单中的填写位置和内容,避免编号存在但未正确体现于出运单据。File the draft bill, commercial invoice and freight records by consignment, checking parties, ports, descriptions, weight and freight treatment. After obtaining a reference, verify its placement and content on the final bill under the actual carrier’s instructions.
避免在截单前集中修改Resolve discrepancies before the cutoff
建议在订舱阶段明确资料提交、草稿确认和最终验证的负责人。若进口商尚未确认信息,先列出待定字段并约定反馈时间,不宜直接提交不确定数据。出单后核对有效状态,将最终提单与申请版本一起留存。Assign responsibility for submission, draft approval and validation during booking. List fields awaiting importer confirmation and agree on response times instead of submitting uncertain data. Check the final status and retain the final bill alongside the application version.